Back to Events
Updated: 01/07/2023
Closed

Wastewater Discharge at South Avenue and Lake Erie Street, Joint Base Pearl Harbor, O‘ahu

First Detected: 12/30/2022
Sign Removed: 01/06/2023
Closed: 12/30/2022
Cause: Failed air relief valve

The public is advised to remain out of waters in Joint Base Pearl Harbor Hickam near the intersection of Lake Erie Street and South Avenue due to a sewage spill.

Volume: approximately 5,000 gallons
Start: 9:00 AM, 12/30/2022
Status: stopped
Cause: Failed air relief valve
Signs will be posted

The public is advised to stay out of the affected waters until the signs have been removed.

Privacy - All rights reserved - 2024